Background

Project Overview

Non-Revenue Water Reduction Projects

Preparation of Detailed Project Report for improving water supply services in Chikkaballapura, Karnataka.

The project is for improving water supply services in Chikkaballapura Town Municipal Council to ensure 24x7 continuous pressurised water supply. The consultancy services were for preparing a Detailed Project Report including investigation, planning, design, detailed engineering and investment planning.

  • Detailed assessment of present water supply services
  • Condition assessment of existing infrastructure
  • Developing current water account
  • Population projection and establishing water demand at tap and at source
  • Capacity analysis of the existing infrastructure and sizing the expansion
  • Hydraulic zoning and design of DMAs
  • Setting up hydraulic network model both for transmission and feeders and separately for distribution system
  • Setting up design criteria
  • Design of all infrastructure components
  • Cost estimation
  • Investment planning
  • Preparing Detailed Project Report and Drawings
Location & Country: Chikkaballapura, Karnataka
Name of Client: Executive Engineer, Karnataka Urban Water Supply and Drainage Board, Kolar
Duration of Assignment (months): 12
Start Date (month/year): April 2010
Completion Date (month/year): May 2011
Professional Staff Months Provided: 12
Names and designation of professional staff involved: Anand K Jalakam
 item