Preparation of Detailed Project Report for improving water supply services in Malavalli, Basavana Bagewadi, Mudhol, Mahalingapur and Indi towns in Karnataka State.

The project is for improving water supply services in different Municipal Councils to ensure 24x7 continuous pressurised water supply. The consultancy services were for preparing a Detailed Project Report including investigation, planning, design, detailed engineering and investment planning.

  • Detailed assessment of present water supply services
  • Condition assessment of existing infrastructure
  • Developing current water account
  • Population projection and establishing water demand at tap and at source
  • Capacity analysis of the existing infrastructure and sizing the expansion
  • Hydraulic zoning and design of DMAs
  • Setting up hydraulic network model both for transmission and feeders and separately for distribution system
  • Setting up design criteria
  • Design of all infrastructure components
  • Cost estimation
  • Investment planning
  • Preparing Detailed Project Report and Drawings
Location & Country: Secondary towns in the State of Karnataka, India
Name of Client: Karnataka Urban Water Supply and Drainage Board
Duration of Assignment (months): 15
Start Date (month/year): May 2013
Completion Date (month/year): July 2014
Professional Staff Months Provided: 10
Names and designation of professional staff involved: Anand K Jalakam